Courses in this Package
Roller Compacted Concrete (S08-001)
Low Impact Development Design Strategies (C07-006)
This online engineering PDH course provides information and guidance on the use of RCC in dams and other civil works structures. Elements discussed include investigation and selection of materials, mixture proportioning, design and construction considerations, construction equipment and techniques, inspection, and performance.
The American Concrete Institute (
RCC may be considered for application where no-slump concrete can be transported, placed, and compacted using earth and rock-fill construction equipment. Ideal RCC projects will involve large placement areas, little or no reinforcement, and little or no embedded metal work or other discontinuities such as piles. Application of RCC should be considered when it is economically competitive with other construction methods. It may be considered in lieu of gabions or riprap for bank protection, especially in those areas where riprap is scarce. It may be considered for large work pads, aprons, or paved areas, massive open foundations, base slabs, cofferdams, massive backfill, emergency repairs, and overtopping protection for embankment dams. It may be used in lieu of conventionally placed concrete in concrete gravity and arch-gravity dams. RCC may be considered for use in levees where foundations are adequate and may also be used in caps for jetties to reduce the amount of required rock.
This 8 PDH online course is applicable to civil, structural or geotechnical engineers, as well as design and construction personnel involved with the planning, design, construction of roller-compacted concrete structures.
This PE continuing education course is intended to provide you with the following specific knowledge and skills:
- RCC applications, objectives and advantages
- Investigation and selection of materials
- Mixture proportioning considerations and selection
- Understanding the properties of RCC
- Design and construction considerations
- Construction methods and equipment
- Quality control and quality assurance in RCC construction
- RCC performance
In this professional engineering CEU course, you need to review the US Corps of Engineers Publication EM 1110-2-2006, "Roller Compacted Concrete".
Upon successful completion of the quiz, print your Certificate of Completion instantly. (Note: if you are paying by check or money order, you will be able to print it after we receive your payment.) For your convenience, we will also email it to you. Please note that you can log in to your account at any time to access and print your Certificate of Completion.
This online engineering PDH course describes the wide array of impact reduction and site design techniques that allow engineers and planners to create stormwater control mechanisms that function in a manner similar to that of natural control mechanisms.
The low-impact development (LID) approach combines a hydrologically functional site design with pollution prevention measures to compensate for land development impacts on hydrology and water quality. The primary goal of Low Impact Development methods is to mimic the predevelopment site hydrology by using site design techniques that store, infiltrate, evaporate, and detain runoff. Use of these techniques helps to reduce off-site runoff and ensure adequate groundwater recharge. Since every aspect of site development affects the hydrologic response of the site, LID control techniques focus mainly on site hydrology.
This 7 PDH online course is intended for civil and environmental engineers and planners as well as construction professionals who are interested in learning about low impact development design techniques and their applications.
This PE continuing education course is intended to provide you with the following specific knowledge and skills:
- Understanding low-impact development goals
- Understanding low-impact development site planning
- Understanding low-impact development hydrologic analysis
- Understanding low-impact development integrated management
- Understanding erosion and sediment control considerations for low-impact development
In this professional engineering CEU course, you need to review the course document titled "Low-Impact Development Design Strategies" prepared by the Prince George's County
Upon successful completion of the quiz, print your Certificate of Completion instantly. (Note: if you are paying by check or money order, you will be able to print it after we receive your payment.) For your convenience, we will also email it to you. Please note that you can log in to your account at any time to access and print your Certificate of Completion.